Jump Main Menu. Go directly to the main content (Acces key S)
Start of main content
Gamesa sells 70 MW Mexican wind farm to Iberdrola
The development will comprise 35 2.0 MW wind turbines.
Gamesa reinforces its presence in Brazil with a 150 MW supply contract
The company will fit 75 G97-2.0 MW turbines and will maintain them for 15 years.
Gamesa showcases its new 2.5 MW turbine at AWEA
The G114-2.5 MW lowers the cost of energy by 10% and increases 29% the energy production.
End of main content
© Gamesa 2010