Jump Main Menu. Go directly to the main content (Acces key S)
Start of main content
The development will comprise 35 2.0 MW wind turbines.
The company will fit 75 G97-2.0 MW turbines and will maintain them for 15 years.
The G114-2.5 MW lowers the cost of energy by 10% and increases 29% the energy production.
End of main content
© Gamesa 2010