Jump Main Menu. Go directly to the main content (Acces key S)

Gamesa

Languages block

End of languages block

Utilities block

End of utilities block

You are in:

  1. Home
  2. Communication
  3. News
Global Thechnology, Everlasting Energy

News

Start of main content

The G128-5.0 MW Offshore beats power generation record for a wind turbine in Spain

08 November 2013

  • The 118.05 MWh of output during 24 hours registered by the Gamesa's offshore prototype beats the previous record of 107.82 MWh set by the 4.5 MW machine.

The prototype offshore turbine installed by Gamesa in Arinaga Quay, in Canary Islands, marked record-high power generation for wind turbines in Spain on 2 November when it produced 118.05 MWh of electricity, surpassing the previous record (of 107.82 MWh), similarly achieved by other company’s product, the G128-4.5 MW turbine. 

This milestone demonstrates the turbine’s tremendous reliability and its ability to withstand extreme wind conditions for more than 24 hours in a row without suffering any incident whatsoever. This record further confirms the suitability of the site selected for reproducing offshore conditions, enabling the capture of all the data needed for type certification purposes.

The G128-5.0 MW Offshore started to operate in July; since then it has generated over 2 GWh of electricity that has gone into the power grid for local consumption. It is the first offshore turbine installed in Spain.

Search News

Date range :

End of main content